



This Clive kitchen remodel is about 75% done - and honestly, progress like this is hard not to share. We've got a full KitchenAid suite going in, and the pieces that are already in place are looking sharp. Wall oven combo, gas cooktop, refrigerator. It's the kind of lineup that makes a kitchen actually work the way it should.
Here's the thing about built-in appliance installation - it's not just about getting the unit in the opening. Everything has to fit right, sit level, and connect correctly before a single finish piece goes on. If that foundation is off, it causes problems down the line. We do this part carefully because it's what makes the final result look seamless.
The gas cooktop went in flush against that stunning marble backsplash. That's not a forgiving surface to work around. Precision matters there. The wall oven combo is set clean in the cabinetry, and the KitchenAid French door refrigerator is placed and ready for its cabinet panels once the finish work catches up.
We're still waiting on the hood and the dishwasher panel to wrap this one up completely. But 75% done on a job like this means the hardest, most technical work is behind us. What's left is detail - and we take that just as seriously as the rest of it.
When you're investing in a kitchen like this, you want the install done right the first time. Appliances that aren't seated properly, connections that aren't clean, clearances that are off - those things create headaches after the job is done. We're not in the business of leaving problems behind.